A Checklist of Must-Have Materials for Your Steel Building Project

11/7/2024

Steel structure projects are widely used in the construction industry because of their advantages, such as high strength, lightweight, and fast construction. This article will briefly introduce the documents and materials that need to be prepared at the initial stage of inquiry for steel structure projects.

prefab steel building project

Customers are required to provide the following documents and information at the initial stage of inquiry:

1. Architectural design drawings: Customers need to prepare architectural and structural design drawings, including floor plans, elevation drawings, and building sections. These drawings help the steel structure company clearly understand the building's overall layout, space requirements, and dimensions. For example, the size and location of each room can be understood through the floor plan, the appearance of the building can be understood through the elevation drawings and the internal structure of the building can be understood through the sectional drawings.

2. Structural design drawings: Structural drawings need to provide a complete design description, such as material requirements, whether the material is galvanized, the type of paint and the thickness of the spray, fire rating, etc. The material parameters, the number of paint layers, and the fire rating will greatly affect the final offer results.
A particularly important part of the structural drawings is the construction node diagrams, through the node diagrams, to grasp the degree of construction difficulty.

For the second component information, including beam and column section type, the steel structure company needs to complete the model deepening according to this information and split production drawings. [Columns such as drawings illustrate a steel beam 10 meters long, a cross-section of an H-beam (such as H400X200X8X13)], according to the deepening of the split manufacturing plan, to grasp the cost of processing.

3. Other profile information includes basic information such as project surroundings, building height, and material stacking site. Building height and surrounding environment, as well as material stacking site, will determine the choice of lifting implementation plan; for example, in commercial center garage roof operation, it is necessary to support and reinforce the garage roof; building height may affect the actual tonnage of crane, material stacking site affects the efficiency of construction operation, the above environmental factors will determine the increase or decrease of the measure cost of the whole project.

According to the above complete information, the steel structure company can make accurate and reasonable quotations.

Summary:

If you also need to do related similar business as well, you need to prepare the following materials for the steel structure company in advance:
  1. Design documents or related materials, including architectural and structural design drawings, specifications, and individual requirements;
  2. Basic information about the project, such as project documents and geological investigation report;
  3. Requirements for related material documents, covering steel, materials used for connections, fireproofing materials, and anti-corrosion materials;
  4. Other materials, such as construction schedules and quality acceptance standard documents, are used.

Michael Zhai

Michael focuses on intelligent manufacturing technology and product promotion in the steel structure construction industry. With extensive hands-on experience in workshop operations and on-site installation management, he has unique insights into fully automated manufacturing, prefabricated assembly, and quality control of steel structures.

Related Products

+86 138 6251 1010

contact@xtdsteel.com

Zhenze, Suzhou, JiangSu Province

Yifeng, Yichun, Jiangxi Province

Guangzhou, Guangdong Province

Changsha, Hunan Province

CONTACT US
Thank you! Your message has been sent.
Unable to send your message. Please fix errors then try again.

Location Information

Why zipcode

Knowing where you plan on building is essential to providing an accurate building estimate.

Search

Popular Keywords: Space Truss Structure, Space Frame Structure