Yichun FACTORY
Our Yichun Manufacturing Base is strategically located in Yifeng Industrial Development Zone, at the geographical center of the Central Triangle Economic Circle. This advantageous location enables us to serve as a hub with excellent connectivity, forming a 2-hour transportation radius that encompasses Nanchang, Changsha, and Wuhan, the three provincial capital cities. Spanning across an expansive area of 82,000 square meters, Our park has successfully completed the first phase, and the operational factory now spans 33,000 square meters. With a dedicated workforce of nearly 100 skilled professionals, we have established three heavy steel production lines, two light steel production lines, one net frame production line, and one pipe support system production line. Our truss car has a maximum lifting capacity of 32 tonnes. With an annual production capacity of over 50,000 tonnes, we are committed to delivering high-quality steel structure components.