It has the characteristics of light weight, high strength, rich colors, convenient and fast construction, earthquake resistance, fire resistance, rain resistance, long life and maintenance-free, and has been promoted and applied.
After the sandwich panel is treated with a special coating, the color steel plate can be kept new for about 10-15 years. After spraying anti-corrosion coating every ten years, the service life of the plate can reach more than 35 years.
Application scenarios: roof, wall, color steel shed, enclosure