Home > Products > Single Board Maintenance (Floor Board Series)
Single Board Maintenance (Floor Board Series)
Sample Title
Sample Text
REF: XTD12
TDV and TDM steel truss floor decking is a composite formwork that processes the steel bars in the floor slab into steel trusses in the factory, and welds the trusses to the galvanized corrugated steel plate bottom formwork. During the construction phase, the steel truss floor decking can withstand the construction load and is directly laid on the beam. Concrete can be poured after simple reinforcement work.
Project Criteria
When requesting a quote, please bear in mind the following:
It can be used immediately after completion and is quick to maintain, without the need for further renovation
Protect the main structure and extend its service life. If the sandwich panels are properly selected and thick enough, they can effectively prevent and reduce thermal deformation of walls and roofs and effectively eliminate common oblique cracks and octagonal cracks.
Suitable for energy-saving renovation of old buildings. The main advantage of using color steel sandwich panels for exterior walls and energy-saving renovation of old buildings is that there is no need for temporary relocation, and there is basically no impact on indoor life and the normal life of users.
This site uses cookies to help deliver services. By using this site, you agree to the use of cookies. If you would like to know more, click our Cookie Policy.