It can completely replace the formwork function, reduce the erection and disassembly of the board, and greatly improve the efficiency of floor construction.
The surface material and insulation material of the sandwich panel are usually non-combustible or difficult to burn materials, which can meet the requirements of fire protection regulations and enhance the overall safety of the building.
Application scenarios: construction projects, municipal projects, industrial plants, public facilities