Factory building | Anhui Feixi New Energy Vehicle Intelligent Industrial Park
Sample Title
Sample Text
Sample Title
Sample Text
Sample Title
Sample Text
Location: Hefei Building area: about 510,000 to 530,000 square meters Steel usage: 8,000 tons Steel structure type: space grid structure Completion time: 2023
Located in Hefei, this large-scale factory building project stands as a remarkable achievement in modern industrial construction. With a total building area of approximately 510,000 to 530,000 square meters, the facility was designed to accommodate high-capacity manufacturing and advanced industrial operations. Built using a sophisticated space grid structure, the design ensures both durability and flexibility, making it ideal for a wide range of applications. The project required over 8,000 tons of steel, highlighting the strength and resilience of its construction while showcasing the engineering excellence behind every detail. Completed in 2023, this steel factory building not only sets new standards for efficiency and structural innovation but also represents the growing demand for large-scale, future-ready industrial spaces in the region.
This site uses cookies to help deliver services. By using this site, you agree to the use of cookies. If you would like to know more, click our Cookie Policy.