Toll Station-Luoyang Guanlin

Location: Luoyang

Building area: 1558.8㎡

Steel usage: 400 tons

Steel structure type: Special-shaped steel structure

Completion time: 2017


The Metal Toll Gate at Luoyang Guanlin is a remarkable example of modern transportation infrastructure, combining functionality with advanced engineering design. Strategically located in Luoyang, this project reflects both innovation and efficiency in toll station construction. Covering a total building area of 1,558.8㎡, the toll gate was constructed with a steel usage of 400 tons, ensuring durability and structural stability. Its distinctive special-shaped steel structure not only enhances strength but also creates an architectural identity that blends practicality with modern aesthetics.

Completed in 2017, the Metal Toll Gate stands as a long-lasting symbol of reliability and performance. It continues to support high traffic volumes while maintaining safety, efficiency, and visual appeal—showcasing the enduring value of steel structure solutions in China’s growing infrastructure landscape.

Learn More...

Related Products

+86 138 6251 1010

contact@xtdsteel.com

Zhenze, Suzhou, JiangSu Province

Yifeng, Yichun, Jiangxi Province

Guangzhou, Guangdong Province

Changsha, Hunan Province

CONTACT US
Thank you! Your message has been sent.
Unable to send your message. Please fix errors then try again.
Buy Now
Product 1 Title

Sample text. Lorem ipsum dolor sit amet, consectetur adipiscing elit nullam nunc justo sagittis suscipit ultrices.

Quantity
$20.00
$17.00

Location Information

Why zipcode

Knowing where you plan on building is essential to providing an accurate building estimate.

Search

Popular Keywords: Space Truss Structure, Space Frame Structure