The steel factory building at Semir Apparel Shanghai Industrial Park is one of XTD’s landmark achievements in large-scale industrial construction. Located in Shanghai, this impressive project covers an area of approximately 60,000 square meters, designed to accommodate advanced apparel manufacturing and modern industrial needs.
The project required the use of 10,000 tons of high-quality steel, ensuring unmatched strength, durability, and long-term performance. Built with a steel structure concrete high-rise system, the factory combines structural efficiency with architectural innovation, supporting both heavy-load operations and future scalability.
Scheduled for completion in 2025, this steel factory building reflects XTD’s expertise in delivering cutting-edge engineering solutions for industrial development in China’s fast-growing economic hubs. The design emphasizes safety, functionality, and sustainable construction, making it a modern benchmark for future industrial projects.
This site uses cookies to help deliver services. By using this site, you agree to the use of cookies. If you would like to know more, click our Cookie Policy.