Plant | Zhejiang Qiantang River Water Conservancy

Power Plant Structure Details

Location: Hangzhou

Building area: 8,100 ㎡

Steel usage: 750 tons

Steel structure type: Standard portal frame

Completion time: 2024


Located in Hangzhou, the Zhejiang Qiantang River Water Conservancy Power Plant represents a modern achievement in sustainable energy infrastructure. Completed in 2024, this project was designed with a strong emphasis on efficiency, durability, and structural precision. With a total building area of 8,100㎡ and a steel usage of 750 tons, the facility integrates advanced engineering methods with practical functionality. Its power plant structure relies on a standard portal frame system, ensuring stability while accommodating the heavy mechanical and operational requirements of a large-scale energy facility.

Strategic Location in Hangzhou

The project’s location in Hangzhou is both symbolic and functional. Situated along the Qiantang River, the facility plays a vital role in supporting the region’s water conservancy efforts while contributing to local energy supply. The integration of the power plant with river management infrastructure highlights the importance of balancing energy generation with environmental responsibility. By leveraging the strategic position, the plant not only serves industrial needs but also strengthens Hangzhou’s role as a hub for modern energy development in Zhejiang Province.

Building Scale and Area

Covering a total area of 8,100㎡, the power plant was carefully designed to optimize both space and functionality. Every aspect of the layout, from the positioning of heavy machinery to the allocation of service zones, was guided by operational efficiency. The plant accommodates large equipment while maintaining accessibility for maintenance and upgrades, ensuring long-term adaptability. The building area also reflects the balance between compact design and the need to host complex operational systems typical of large power plant structures.

Use of Steel and Structural Advantages

One of the defining features of this project is the extensive use of steel in its construction. With a total steel usage of 750 tons, the facility benefits from the inherent durability, load-bearing strength, and flexibility that steel structures provide. The choice of a power plant structure built with steel ensures resilience against both natural elements and operational stresses. Steel not only supports the heavy machinery inside but also provides a long service life with reduced maintenance compared to other materials.

Standard Portal Frame Design

The structure relies on a standard portal frame, a proven model in industrial construction. This type of design is particularly well-suited for wide-span buildings, offering an unobstructed interior that maximizes operational space. For a power plant, this is critical, as it allows for seamless integration of turbines, generators, and other large-scale equipment without structural interference. The portal frame also supports rapid construction timelines, cost efficiency, and flexibility in future modifications or expansions.

Completion and Significance in 2024

The project reached completion in 2024, marking an important milestone for Zhejiang’s water conservancy and energy infrastructure. The power plant not only enhances the region’s energy security but also represents the continuous modernization of industrial facilities in China. As a newly finished project, it stands as a benchmark for combining traditional water management with advanced power plant structures that embody efficiency and strength.

Role in Energy and Water Conservancy

Beyond being an energy-generating facility, this power plant plays a dual role in the broader Qiantang River Water Conservancy project. By integrating energy production with water management, the plant contributes to flood control, irrigation, and environmental sustainability. This multifunctional role demonstrates how modern infrastructure can address multiple community and industrial needs within a single facility.

Long-Term Value

The Zhejiang Qiantang River Water Conservancy Power Plant reflects a vision of long-term growth. With its durable steel construction, efficient portal frame design, and strategic location, the facility is expected to provide reliable service for decades. Its design prioritizes safety, energy efficiency, and adaptability, making it a model for future projects in the region and beyond.

The completion of the Zhejiang Qiantang River Water Conservancy power plant in 2024 underscores the importance of combining engineering expertise with environmental responsibility. With its 8,100㎡ building area, 750 tons of steel usage, and standard portal frame design, the project highlights the strength of modern power plant structures. Positioned in Hangzhou, the facility is not only a contributor to the region’s energy needs but also a symbol of sustainable infrastructure development in Zhejiang Province.

Learn More...

Related Products

+86 138 6251 1010

contact@xtdsteel.com

Zhenze, Suzhou, JiangSu Province

Yifeng, Yichun, Jiangxi Province

Guangzhou, Guangdong Province

Changsha, Hunan Province

CONTACT US
Thank you! Your message has been sent.
Unable to send your message. Please fix errors then try again.
Buy Now
Product 1 Title

Sample text. Lorem ipsum dolor sit amet, consectetur adipiscing elit nullam nunc justo sagittis suscipit ultrices.

Quantity
$20.00
$17.00

Location Information

Why zipcode

Knowing where you plan on building is essential to providing an accurate building estimate.

Search

Popular Keywords: Space Truss Structure, Space Frame Structure